13 June 2010

Glue, Glue Glorious Glue!

Monday was productive, I managed to glue in the wae’s and ring frame. During the week I marked out a line in the hull to cut out at the bow and stern for the decking to go and by Friday evening I’d even managed to cut the stern portion with a hand saw.

Saturday I wizened up and used my jigsaw to cut the bow. Then it was back to mixing up more epoxy, this time adding sawdust to make a strong filleting paste. This mix I used for the fillets that will bond the ring frame to the inside of the hull. The idea is that it will make a stronger bond than if I use fairing powder. Unfortunately I ran out of suitable sawdust so it was back to a conventional fillet for the bulkheads. That evening I was back in mixing epoxy to add strip of fiberglass to the fillets on the ring frame. Because the mast attaches here, it is a major stress point hence the extra reinforcements.

I’ve decided not to strip plank the decking and use the 4mm ply instead. This should speed things up, although I will glass both sides for extra strength. By the end of today I’d cut the deck blanks, drawn the outlines of the bow and stern and glassed the first side. Later tonight I will give it an extra coat of epoxy.

End of week eighteen and the wae’s, bulkheads and ring frame are in place, inching the hull ever so closer to completion:

06 June 2010

Fixtures and Fittings

Week seventeen. On Monday I finally made it to Absolute Marine and picked up two hatches and two inspection ports (one 4 inch and one 6 inch). Unfortunately they were out of bungs so I had wait till Saturday before I got those. 

I plan to use one of the hatches for top access to the aft bulkhead and the other for a storage area I will to build under the centre seat although I am a little worried about the extra weight it will add.

That evening I laminated the timber for waes, saddles and ring frame. Wednesday morning I was traveling again, and when I got back on Friday evening the glue had completely set.  But I did email Gary and ask him to make me a set of sails.

Saturday morning was spent picking up Loki, getting the bungs and shaping the waes and saddles. In the afternoon I picked up Cecile, Nico, Eloise and Cecile’s mum from the airport. So that was the end of my work day.

Sunday I made another trip to the airport, then it was off to the pool with the family. Luckily Eloise is starting to get a liking for water as well, she even came for a swim. After lunch and putting the children to bed I finished off the saddles, ring frame and cut holes in the bulkheads for the bungs and inspection ports.

Tomorrow I’d like to glue everything in place, but the heater is being used in the spare room. I’ll see if I can find a cheap one to use, we need one for the spare room anyway.

The finished fittings: